Monday, June 20, 2016

AAVS Day 10

The last day was the assembly day. The structure was scheduled to be done by 19:00. The groups overcame intense working to achieve the goal. The concrete blocks were dry by the morning and the assembly group was busy connecting the robot-cut components to each other. After the connection of the components was finished we all brought the vault outside to mount it on the walls. After the vault was in place the lighting group took wheel to place the LEDs. Two extra foam parts were cut out and added to the walls with shafts for the LED strips to rest in. By the afternoon the lighting was finished and the workshop came to an end. 