Tuesday, June 21, 2016

AAVS Day 9

With the lighting almost ready I went on to help with the other groups. The connection group had to empty foam blocks and make concrete to fill them with. The concrete would be heavy and as a result would connect the walls of the vault on the ground. The ninth day was all hard work on making concrete and emptying blocks.  In the afternoon we also had a lecture by Sina Mostafavi from Delft Hyperbody team about robotic fabrication.


No comments:

Post a Comment